Monday, March 14, 2011

Brickwork and Top Roof Complete

Brickwork and Top roof are complete. Finally we have some protection from the rain! The brickwork took about 3 weeks and the roof 2 days. We are really happy with our roof tile and gutter colour selection. The next job is the render, eaves, external painting and bottom roof. Scaffolding stays up for the render, paint and eaves, then comes down for the bottom roof to be installed. Then work can begin on the internals...






Thursday, December 9, 2010

Frames Complete

Our frames and windows were completed last week. We can start to see the house take shape now which is really exciting. The house is bigger than we imagined it would like like. Not a bad thing!! Now the wait for a brick layer and plumber begins. The plumber needs to do the internal drainage. Once the bricking is complete, then the rendering begins.

Wednesday, October 13, 2010

Soil Removal

We had 19 tonnes of soil removed from the block today. The soil/clay to be removed was from the cutting of the block and the piering. We had to move it today as the plumbers are supposed to start the drainage tomorrow morning. Luckily we had a family friend with a bobcat and truck!! He did a great job clearing and leveling the front of the block. There is about 5 tonnes of clean fill left in the front corner which we will have to move to the back of the block over the weekend with the wheel barrow. Not looking forward to that...

Saturday, October 9, 2010

Slab Complete

The concreters poured the slab today. They turned up at 6.50am and waited 10 minutes for the official start time of 7am (got to keep the locals happy!), then got to work. Truck after truck came along and poured concrete into the pump, which had an enourmous arm reaching right to the back of the property. By the end of the day the concrete set and was then smoothed and polished. The form work has been removed and now we need to wait 1 week for the slab to cure. Next step, external drainage and frames...






View from the back garden

View from the driveway

Thursday, October 7, 2010

Building Commences - Finally!!

At last, the builders have begun. A couple of weeks ago the block was flattened, then earlier this week piering begun. There are 59 piers in total which are each about 1.2 metres deep. The form workers formed up the perimiter of the slab and then the plumber did the internal plumbing. Today the form workers were back to finish off the prep work for the slab. Tomorrow they pour the slab, weather permitting! Here are some photo's of the prep work for the slab. I'll post some more once the slab is poured.











Saturday, August 14, 2010

Demo Complete - Pegout Begins

After a week of rain delay, the demolition is finally complete. The block was nicely flattened by the demolition company. The builder came and put up a sediment control fence and laid some rubble at the block entry/exit point. Hopefully the perimiter fence will go up this week to keep people off the block.




The Pegout was done this week. The size of the house foot print is huge!!


Monday, August 2, 2010

Demolition - Day 3

Today the heavy machinery arrived. They made a real mess of the place and the diggers arm went through the house like a knife through butter. We loved it!! And never being afraid to get my hands dirty, I took a seat front and centre in the digger to make sure the house got smashed real good. I need a career change I tell you!! I had a blast. Enjoy the pics!